OVE
INSTALLATION INSTRUCTIONS
VITREOUS CHINA WALL-HUNG LAVATORY
K-19950W/K-19951W
-1-
1062888-T01-A
106
2
324
200131
, 2006
Copyright Kohler China Ltd., 2006
·
·
·
Observe all local plumbing and building codes.
Prior to installation, unpack the new lavatory and inspect it
for damage. Return the lavatory to its protective carton
until you are ready to install it.
All information in these instructions are based the latest
product information available at the time of publication.
Kohler China reserves the right to make changes in
product characteristics, packaging, or availability at any
time without notice.
Make sure that the wall and floor are square
and plumb to ensure proper installation.
IMPORTANT:
·
·
·
ORDERING INFORMATION
OVE Vanity Top .................................................K-19950W
Includes Mounting Kits .....................................1034692
OVE Vanity Top .................................................K-19951W
Includes Mounting Kits .....................................1034692
........................................................K-19950W
........................................................1034692
........................................................K-19951W
........................................................1034692
REQUIRED MATERIALS/
(NOT SUPPLIED)
TOOLS
·
·
·
·
·
Level
Drill with
bit
6mm
14mm wrench
Framing square
Channel lock pliers
Tape measure
·
·
·
·
·
·
·
6mm
14mm