Note:
During installation the protectors are to remain on the valve body.
1.) Construct a suitable wall frame for the mounting plate(1). Make sure
that the frame is level and allows for the correct valve rough-in per
the rough-in section on page1.
2.) Fix the mounting plate to the valve body(2) with the washers(3) and
the three fixing screws(4). Be sure the protectors(5,6) face front and
the inlet with the red mark is on the left.
3.) The outer surface of the finished wall should be between the MAX &
MIN marks on the protectors(6) shown in Fig.1 and Fig.2.
The size of the opening in the finished wall is as shown in Fig.2.
4.) Fix the mounting plate and valve body to the wall frame.
Note:
Ensure the centreline of the valve is perpendicular to the wall.
Make sure that the valve body is securely fastened to the wall frame.
5.) Connect Rc1/2” hot and cold supplies to the valve inlets shown in
Fig.1. Connect the hot supply to the left inlet with the red mark.
INSTALLATION - Valve Body
1.) Remove the protectors after the wall is finished.
2) Tighten the screws(7) with 3mm hex wrench(8) to secure the
mounting plate(9) until it is against the wall.
3) Loosen screws(10) on the faceplate kit(11) with 2mm hex
wrench(12).
4) Slide the faceplate kit onto the connector(13) and bonnet(14)
until it is against the wall. Tighten screws(10) to secure the
faceplate kit.
Note:
Be careful not to damage the o-ring(15) on the
connector(13).
5) Slide the washer(16) into the groove on the faceplate kit.
Loosen the screw(17) on the spout(18) with 2mm hex
wrench(12).
6) Slide the spout onto the connector with its outlet downwards.
Tighten the screw(17) to secure the spout.
8) Close the valve and loosen the screw(19) on the handle with
2.5mm hex wrench(20). Install the handle(21) onto the valve
body. Tilt it upwards and tighten the screw.
9) Press the plug button(22) into the hole and close the valve.
INSTALLATION - Handle and Spout
1161638-AN2-B 28/04/16
2
1
2
Fig.2
Fig.1
8
7
9
12
11
10
13 15
14
16
18
20
21
19
22
68
171
3
4
5
6
6
Hot
Cold
Fig.3
Finished wall
Finished wall
17
1.) Ensure that all coupling nuts are fastened securely.
2.) Ensure that the handle is in the off position.
3.) Open the drain and turn on the main water supply and check for
leaks. Repair as needed.
4.) Remove the aerator kit (23) using the key(24).
5.) Turn the tap on and flush hot and cold water through the spout
for about one minute to remove any debris. Re-check for leaks
at this time.
6.) Remove any debris from the aerator.
7.) Turn the tap off and reinstall the aerator kit.
INSTALLATION CHECK
CLEANING INSTRUCTIONS
All Finishes: Clean the finish with mild soap and warm water. Wipe entire surface completely dry with a
clean soft cloth. Many cleaners may contain such chemicals as ammonia, chlorine, toilet chemicals etc. which
could adversely affect the finish and are not recommended for cleaning.
Do not use abrasive cleaners or solvents on Kohler fittings.
1161638-AN2-B 28/04/16
3
Finished wall
23
24