Operation and maintenance manual RollUP - A02 01-2021
Page
41
to
50
The RollUP must be inspected at intervals of 12 months in accordance with the inspection card.
The evaluations / inspection must be documented by means of a high-resolution photo -
archive.
10.3
Extraordinary tests of the RollUP
Außerordentliche Prüfungen müssen nach Schadensfällen oder besonderen Vorkommnissen,
welche die Tragfähigkeit beeinflussen können, sowie nach Austausch- / Reparaturarbeiten
durchgeführt werden.
10.4
Documentation of the quality inspection / periodic inspection /
other inspections
If the test result is positive, the test carried out must be confirmed on the device run card.
Replacement work on load-bearing parts (straps, carabiners) must be entered on the
equipment run card, and an inspection for a special reason by a second inspector (4-eyes
principle) must be carried out.
If the test result is negative, the RollUP must be returned to the manufacturer for repair or the
device must be taken out of service.
10.5
Sorting out
After expiry of the period of use specified in the section Periodic inspections, the RollUP must
be taken out of service.
If the continued airworthiness can no longer be determined during the periodic inspection and
the device is no longer worthy of repair, the RollUP must also be retired.
The equipment record card shall be closed by registration and certification and shall be kept for
3 years from the month of retirement by the last holder.
The RollUP must be clearly marked as discarded.
Systems that have been discarded may continue to be used for training purposes after they
have been discarded. Use for horizontal or vertical recovery and operation with aircraft is
excluded.