Section 2: Installing the PROCESSOR
Moving the PROCESSOR to the Work Area
Warning
The unpacked, empty PROCESSOR weighs approximately 84 kg (185 lb). Use 2 people to move it. The PUMPS
are heavy and are located in the back of the PROCESSOR. Rotate the PROCESSOR so that each person supports
1
⁄
2
the weight of the PROCESSOR.
[1] Move the PROCESSOR to the work area where you plan to install it. When possible move the PROCESSOR
in its upright position.
(a) If the PROCESSOR does not fit through the door opening of the work area, do the steps below.
1. Check that the BACK ACCESS PANEL and DRIVE SIDE ACCESS PANEL are removed. If not,
loosen the 2 SCREWS on each PANEL and remove the PANEL.
2. Check that the FRONT ACCESS PANEL is installed. The FRONT ACCESS will protect the FILM
DETECTOR ASSEMBLY from damage when moving the PROCESSOR through a narrow door
opening.
3. To reduce space requirements, check that the LEVELING FEET are rotated up into the PROCESSOR
as far as possible.
4. Rotate the PROCESSOR so that the non-drive side faces down. See the figure for the dimensions of
the PROCESSOR with the TOP COVER and PANELS removed.
5. To reduce space requirements even more, unscrew the MOUNTING BRACKET for the
INTERLOCK SWITCH and let the INTERLOCK SWITCH hang inside the PROCESSOR.
Figure 4
Moving the PROCESSOR through a Narrow Door Opening
H130_0133HA
41.3 cm
66.7 cm
(26 1/4 in.)
(16 1/4 in.)
(27 1/4 in.)
69.2 cm
34.3 cm
(13 1/2 in.)
non-drive
FRONT ACCESS
PANEL
side
H130_0133HCB
drive
side
BRACKET
MOUNTING
INTERLOCK
SWITCH