
AZURA® Assistant ASM 2.2L Instructions V6803
Operation 33
Note:
Malfunctioning system after repeated standby possible. After
repeatedly using the standby, switch off the power switch and back on
again, to reset the data storage.
9.2
GLP-Data
The following GLP data of the assistant can be found in the software
GLP data
Explanation
Device information
Serial number
FYCYYWWXXXXX
Firmware version
Current firmware version of the device
Operating time
Operating hours after production
Date of installation
Date of manufacture
Last maintenance
Date of laste maintenance
Leak sensor
Serial number
Serial number leak sensor
Firmware version
Current firmware version of the leak
sensor
Note:
The GLP data of the installed device modules are read by the
ASM 2.2L. You can read the individual GLP data in the instructions of the
respective device module:
www.knauer.net/en/Support/User-manuals
9.3
Startup
Use this checklist to determine whether the system is ready for initial
startup:
The modules are at the desired location.
The power plugs of the modules are plugged in.
The LAN connections between the modules and router are connected.
The LAN cable is connected to the workstation and router.
The chromatography software has been installed by KNAUER or a com-
pany authorized by KNAUER.
The capillaries in the solvent bottles have a filter insert.
All capillaries are tightly connected.
Capillaries, tubings and cables are connected.
In case of the detector the flow cell is installed.
Liquid container is sufficiently filled.
Washing container is sufficiently filled.
Checklist prior to
switch-on
Prerequisites