13
Installation and initial startup
AZURA® Detector UVD 2.1L Instructions, V6831
4.4 Connecting the leak management
The leak management consists of the leak sensor and the drainage sys-
tem. The drainage system ensures that escaping liquids flow into a waste
bottle. If there is too much liquid, the red LED starts flashing. Both the de-
vice and the data acquisition via chromatography software are stopped.
The front cover is removed.
Procedure
Process
Figure
1.
Carefully push the funnel
1
into the center opening of the
capillary guide
2
.
1
2
Fig. 3
Funnel and capillary guide
2.
Push the long ending of the
first nozzle
4
into the hose
3
.
3
4
Fig. 4
Hose and nozzle
3.
Afterwards, push the nozzle
onto the funnel.
4.
Push the other end of the hose
onto the nozzle
5
of the leak
tray.
5
Fig. 5
Hose connected to device
5.
Attach the waste nozzle
6
to
the bottom unit
6.
Attach the wastehose o the
waste nozzle and connect it to
the waste container.
7.
Place the waste container be-
low the devices.
6
Fig. 6
Leak tray with nozzle
Attach the front cover.
Prerequisites
Next steps