76
Figure 6-32
16)
Hook the Rope Guide B on the Support Shaft as shown in
Figure 6-33
and fasten the Rope Guide B
with the Socket Bolts. Pay special attention to attach the Rope Guide B so that the Wire Rope comes
out from the gap between Rope Guide A and Rope Guide B.
Figure 6-33
17)
After completing the Wire Rope installation through the Rope Guide, place the Bottom Hook Block on
the floor so that it is positioned perpendicular to the hoist. Slowly and carefully, insert the rope end into
the bottom block as shown in
Figure 6-34
. To make rope insertion easier, temporarily attach a wire to
the end of the Wire Rope with adhesive tape and use the wire to pull the Wire Rope through the first
Sheave of the Bottom Hook Block. Securely tie a string or cord to the end of the Wire Rope and pull
the Wire Rope up to the hoist from the scaffolding/platform.
Summary of Contents for Harrington RY Series
Page 15: ...15 2 3 Part Names Figure 2 1 RY Part Names...
Page 42: ...42 Figure 3 20 Hoist Upper and Lower Limit Switch ULLS...
Page 57: ...57 Table 5 8 Various shapes that require the wire rope to be replaced...
Page 67: ...67 Table 6 9 Motor Brake Gap Capacity Code Brake Gap G inch mm RY030 RY050 0 032 0 8...
Page 104: ...104 9 3 Trolley Frame Parts Figure 9 3 Trolley Frame Parts...
Page 112: ...112 9 10 Hoist Motor Parts Figure 9 10 Hoist Motor Parts...
Page 114: ...114 9 11 Trolley Motor Parts Figure 9 11 Trolley Motor Parts...
Page 116: ...116 9 12 Control Panel Box Parts Figure 9 12 Control Panel Box Parts...