8
INSTALLATION INSTRUCTIONS
Prepare Location
■
It is recommended that the vent system be installed before
hood is installed.
■
Before making cutouts, make sure there is proper clearance
within the ceiling or wall for exhaust vent.
■
Check your ceiling height and the hood height maximum
before you select your hood.
1.
Disconnect power.
2.
Determine which venting method to use: roof, wall, or
non-vented.
3.
Select a flat surface for assembling the range hood. Place
covering over that surface.
4.
Using two or more people, lift range hood onto covered
surface.
Range Hood Mounting Screws Installation
1.
Determine and mark the centerline on the wall where the
canopy hood will be installed.
2.
Select a mounting height between a minimum of 24"
(61.0
cm) for an electric cooking surface, a minimum of
27" (68.6 cm) for a gas cooking surface, and a suggested
maximum of 36" (91.4 cm) above the range to the bottom of
the hood. Mark a reference line on the wall.
3.
Tape template in place, aligning the template centerline and
bottom of template with hood bottom line and with the
centerline marked on the wall.
4.
Mark centers of the fastener locations through the template
to the wall.
IMPORTANT:
All canopy mounting screws must be installed
into wood where possible. If there is no wood to screw into,
additional wall framing supports may be required, or use the four
10 x 60 mm wall anchors and 5.4 x 75 mm screws.
Remove the template.
5.
For wood, drill 3/16" (4.8 mm) pilot holes at all locations
where screws are being installed into wood.
For wall anchors, drill 7/16" (10 mm) holes at all locations
where wall anchors are being used.
6.
For wood, install two 5 x 45 mm mounting screws. Leave a
1/4" (6.4 mm) gap between the wall and the back of the
screw head to slide range hood into place. For wall anchors,
install the 10 x 60 mm wall anchors and install the
5.4 x 75 mm screws into the wall anchors. Tighten until the
wall anchors are secure. Back the screws out 1/4" (6.4 mm).
Vent Cover Bracket Installation
1.
Attach vent cover bracket to wall flush to the ceiling using
two 5 x 45 mm screws. Use the optional wall anchors if
needed.
Complete Preparation
1.
Determine and make all necessary cuts in the wall for the
vent system. Install the vent system before installing the
hood. See the “Venting Requirements” section.
2.
Determine the required height for the home power supply
cable and drill a 1¼" (3.2 cm) hole at this location.
3.
Run the home power supply cable according to the National
Electrical Code or CSA Standards and local codes and
ordinances. There must be enough 1/2" (13 mm) conduit and
wires from the fused disconnect (or circuit breaker) box to
make the connection in the hood’s electrical terminal box.
NOTE:
Do not reconnect power until installation is complete.
4.
Use caulk to seal all openings.
WARNING
Excessive Weight Hazard
Use two or more people to move and install
range hood.
Failure to do so can result in back or other injury.
Ve
rtical Cente
r
lin
e
C
L
L
L
A
W
R
A
E
R
E
T
A
L
P
M
E
T
G
N
I
T
N
U
O
M
E
G
D
E
M
O
T
T
O
B
N
G
I
L
A
E
N
I
L
L
I
C
N
E
P
H
T
I
W
M
O
T
T
O
B
G
N
I
T
A
C
I
D
N
I
D
O
O
H
E
H
T
F
O
t
h
g
i
e
H
n
o
i
t
a
l
l
a
t
s
n
I
T
R
O
P
P
U
S
L
L
A
W
R
A
E
R
R
O
S
D
U
T
S
H
G
U
O
R
H
T
S
E
L
O
H
T
O
L
I
P
"
6
1
/
3
)
O
W
T
(
2
L
L
I
R
D
e
n
i
L
l
a
t
n
o
z
i
r
o
H
A
C
B
A. Centerline
B. Fastener locations
C. Mounting height reference
(hood bottom line)
¹⁄₄
"
(6.4 mm)
A
C
B
A. Ceiling
B. Wall
C. Centerline
Summary of Contents for KVWB606HBS0
Page 16: ...16 NOTES ...