5 .3 .1 .1 General Threading
• Put the full reel on the fore side reel
shaft and thread via the fore side
lever arm and the extension arm.
• Run film via the guide roller
“Rewind”.
• Wind-up the film several times
around the rear take-up spool.
5 .3 .1 .2 Making Up a Program
• Switch on the power supply - main switch on spool tower to position “I”.
• Position the operating mode rotary switch to
.
• Adjust the spool size toggle switch depending on
(600 m) or
(- 5000 m).
• If necessary, put a distance disk on the fore side friction shaft.
• Pin up the film spool with the first copy onto the fore side take-off friction shaft and an
empty spool onto the rear take-up friction shaft.
• Fix both spools by screwing the knurled nuts onto the shafts.
• Thread the film corresponding to the threading instructions.
• Activate the frictions, by turning manually the film spool or by tensioning the film until
the lever arm reaches it working position (middle position).
• Turn the speed rotary switch anticlockwise to the zero-position (left position) and wait
until the green indicator LED illuminates.
“Rewind”
to take-off friction
Summary of Contents for FP 25 E PREMIERE
Page 2: ......
Page 22: ...FP 25 E Issue 06 2011 10 ...
Page 56: ...FP 25 E Issue 06 2011 44 ...
Page 64: ...FP 25 E Issue 06 2011 52 ...
Page 104: ...FP 25 E Issue 06 2011 92 Figure 1 1A 1C 1B 1D Figure 2 2A Fig 2A Fig 2B Fig 2C 2D 2B ...
Page 110: ...FP 25 E Issue 06 2011 98 10A Figure 11 Figure 11 11A 11B 11C Fig 11A Fig 11C Fig 11B ...