FP 25 E
Issue: 06/2011
54
5 .2
Threading the Film for Projection Operation
5 .2 .1 FP 25 E with Spool Tower
5 .2 .1 .1 Threading Overview
Back view
Front view
1. Put the
full film reel
onto the
rear friction shaft
5. Thread the film through the f
ore side
guide rollers on the projector head
2. Thread the film via the
rear lever arm
6. Thread the film through the
feed sprocket
3. Thread the film through the guide rollers on
the
rear extension arm
7. Thread the film through the
film gate
4. Thread the film via the
rear guide roller
on the projector head
8. Thread the film through the
reverse-scan
sound device
9. Thread the film through the
bottom sprocket
10. Thread the film through the guide rollers
on the
fore side extension arm
11. Thread the film over
fore side lever arm
12. Put the
empty film reel
on the
fore side
take-up friction shaft
X
NOTE
The film must be threaded through
both lever arms .
Summary of Contents for FP 25 E PREMIERE
Page 2: ......
Page 22: ...FP 25 E Issue 06 2011 10 ...
Page 56: ...FP 25 E Issue 06 2011 44 ...
Page 64: ...FP 25 E Issue 06 2011 52 ...
Page 104: ...FP 25 E Issue 06 2011 92 Figure 1 1A 1C 1B 1D Figure 2 2A Fig 2A Fig 2B Fig 2C 2D 2B ...
Page 110: ...FP 25 E Issue 06 2011 98 10A Figure 11 Figure 11 11A 11B 11C Fig 11A Fig 11C Fig 11B ...