background image

3

Tools and Materials Needed

TOOLS

•  Pencil

•  6 Foot Folding Rule or Tape Measure

•  Drill, Hand or Electric

•  Drill Bit 1/8" Dia. (For Sheet Metal Screws)

•  5/16" Nut Driver or 5/16" Socket w/Ratchet

•  Screw Driver (Blade-Type)

•  Gloves

•  Safety Glasses

MATERIALS

•  6" Pipe, 6" Elbow, Collar and Thimble; As Required 

(24 gauge min.)

•  1/2" Sheet Metal Screws (No. 10A x 1/2")

•  6" Inside Diameter Underwriters Laboratories (UL) 

Listed  Residential  Solid  Fuel  Factory-Built  Triple 

wall Chimney or Exiting Masonry Chimney.

•  Floor  Protector  Material  As  Specified  in  this 

manual.

•  Furnace Cement (Manufacturer Recommends: 

Rutland Black Code 78 or Equivalent)

(SIDE VIEW)

(FRONT VIEW)

(TOP VIEW)

DO NOT BURN:

•  Residential or commercial garbage;

•  Lawn clippings or yard waste;

•  Materials containing rubber, including tires;

•  Materials containing plastic;

•  Waste  petroleum  products,  paints  or  paint 

thinners, or asphalt products;

•  Materials containing asbestos;

•  Construction or demolition debris;

•  Paper  products,  cardboard,  plywood,  or 

particleboard.  The  prohibition  against  burning 

these materials does not prohibit the use of fire 

starters made from paper, cardboard, saw dust, 

wax  and  similar  substances  for  the  purpose  of 

starting a fire in unaffected wood heater.

•  Railroad ties or pressure-treated wood;

•  Manure or animal remains;

•  Salt  water  driftwood  or  other  previously  salt 

water saturated materials;

•  Unseasoned wood;

•  Any  materials  that  are  not  included  in  the 

warranty  and  owner’s  manual  for  the  subject 

wood heater; or

•  Any  materials  that  were  not  included  in  the 

certification tests for the subject wood heater.

Summary of Contents for 2016E

Page 1: ...Before Starting The Installation or Operating This Heater Improper Installation Could Void Your Warranty Please read this entire manual before you install and use your new room heater Failure to follo...

Page 2: ...STM E2780 10 single Burn Rate Appendix and an efficiency of 66 6 This wood heater has a manufacturer set minimum low burn rate that must not be altered It is against federal regulations to alter this...

Page 3: ...ercial garbage Lawn clippings or yard waste Materials containing rubber including tires Materials containing plastic Waste petroleum products paints or paint thinners or asphalt products Materials con...

Page 4: ...e this heater who is unfamiliar with the correct operation of the heater 12 For additional information on using your Room Heater safely obtain a copy of the National Fire Protection Association NFPA p...

Page 5: ...vision that clearances may only be reduced by means approved by regulatory authority CAUTION Keep furnishings and other combustible materials away from the heater Stove Clearances A Side Wall 18 457mm...

Page 6: ...ns Check Figures 2 3 4 You should have at least the clearances shown from the heater and the connector pipe to combustible surfaces If you have a solid brick or stone wall behind your heater you can p...

Page 7: ...Heat Shield 891861 1 8 10AB x 3 8 Hex Screw 83172 12 N S 12 x 3 4 Teks Screw C23799 4 ASSEMBLY INSTRUCTIONS Step 1 THE BLOWER ASSEMBLY MUST BE DISCONNECTED FROM THE SOURCE OF ELECTRICAL SUPPLY BEFORE...

Page 8: ...Chimneys perform two functions one of which is apparent The chimney provides a means for exhausting smoke and flue gases resulting from combustion of the fuel Secondarily though the chimney provides D...

Page 9: ...lti layered construction It is designed to provide enough insulation and or air cooling so that the base back and sides can be safely placed in direct contact with combustible floors and walls Althoug...

Page 10: ...flue outlet requires a 6 152mm diameter for optimum drafting but can function well with an 8 203mm but becomes borderline beyond an 8 203mm diameter Masonry chimneys built of concrete blocks with or...

Page 11: ...fireclay at least 5 8 inch thick or metal thimble being sure that the thimble is flush with the inner flue lining secure the thimble in place with refractory mortar The thimble should be surrounded on...

Page 12: ...himney connector and a minimum 24 gage ventilated wall thimble which has two air channels of 1 25 4 mm each construct a wall pass through There shall be a minimum 6 152 4 mm separation area containing...

Page 13: ...The pipe cannot extend into the chimney flue Fig 8 5 Seal each connector pipe joint with furnace cement Also seal the pipe at the chimney 6 Use 3 sheet metal screws at each joint to make the piping ri...

Page 14: ...ocess as a vapor in the case of wood stoves the moisture in the wood being burned leaves the stove as a vapor The higher heating value is when water leaves the combustion process completely condensed...

Page 15: ...Do not expect a heater to draw It is the chimney that creates the draft Smoke spillage into the house or excessive buildup of water or creosote in the chimney are warnings that the chimney is not func...

Page 16: ...connector and chimney should be inspected at least once every two months during the heating season to determine if a creosote buildup has occurred If creosote has accumulated it should be removed to...

Page 17: ...ust be replaced using original manufacturers parts purchased through your dealer or directly from the appliance manufacturer Use of third party components will void the warranty 1 2 3 4 6 5 7 Key Part...

Page 18: ...irebrick Half 4 1 2 X 4 1 2 2 4 86645 Tube 7 32 Secondary Air 1 5 88250 Board Ceramic Fiber 2 In order to maintain warranty components must be replaced using original manufacturers parts purchased thr...

Page 19: ...r assembly must be disconnected from the source of electrical supply before attempting any maintenance Brick Placement Top Inside View Of Firebox 1 Insert right left side firebrick as shown 2 Insert r...

Page 20: ...tube and remove to allow the tube to be removed and replaced Whenever ashes get 3 to 4 inches deep in your firebox or ash pan and when the fire has burned down and cooled remove excess ashes Leave an...

Page 21: ...IONS 1 United States Stove Company shall not be liable for incidental consequential special or contingent damages anyone might suffer as a result of their breach of this written warranty or any implie...

Page 22: ...to the heater When ordering repair parts always give the following information as shown in this list 1 The part number _____________________________________ 2 The part description ___________________...

Page 23: ...___ Reason for Purchase qAlternative Heat qMain Heat Source qDecoration qCost qOther _________________________ What was the determining factor for purchasing your new appliance _______ I have read the...

Page 24: ...CUT HERE CUT HERE Fold Here Fold Here United States Stove Company P O Box 151 South Pittsburg TN 37380 Fold Here PLACE STAMP HERE...

Reviews: