Kimans HYDRASONIC S8 User Manual Download Page 3

1.

 

General Information 

1.1 Application and Function 

 

This Hydrasonic S8 is designed for the measurement of consumed energy in a closed heating, cooling or heating 
/cooling system. 

1.2

 

Contents of the package 

 

Heat  meter  or  heat/cooling  meter,  consisting  of  a  calculator,  a  flow  sensor  and  two  temperatures 
sensors, all permanently connected to each other 

 

Installation kit (depending on type) 

 

Installation and Operating Instructions 

 

Operating Instructions, Communication Interfaces S3(C) (with meters with an optional interface) 

 

Declaration of Conformity 

1.3 Standards 

 

Valid standards for the application of heat meters: EN 1434, parts 1 

 6; the Measuring instruments 

 

Directive 2014/32/EU, Annexes I and MI-004; and the relevant national verification regulations. 

 

For the selection, installation, commissioning, monitoring and maintenance of the instrument observe 
the standard EN 1434 part 6, as well as the verification regulations PTB TR K8 + K9 for Germany (and any 
relevant national verification regulations in other countries). 

 

National regulations for the consumption measurement of cooling must be observed. 

 

The technical regulations for electrical installations must be observed. 

 

This product fulfils the requirements of the European Council Directive on Electromagnetic Compatibility 
(EMC Directive) 2014/30/EU. 

 

The identification plate of the instrument and the seals must not be removed or damaged otherwise the 
guarantee and the approved application of the instrument are no longer valid! 

 

To  achieve  measurement  stability  of  the  meter  it  is  necessary  that  the  water  quality  meets  the 
requirements  of  the  AGFW-recommendation  FW-510  and  the  document  VDI  (Association  of  German 
Engineers) VDI 2035. 

 

The heat meter left the factory in conformance with all applicable safety regulations. All maintenance 
and repair work are to be carried out only by qualified and authorized technical personnel. 

 

Instruments with activated radio function are not allowed on air freight. 

 

The correct installation point in the system must be chosen: inlet or outlet flow. 

 

The  temperature  sensor  cables  and  the  cable  between  the  calculator  and  flow  sensor  must  not  be 
kinked, rolled up, lengthened or shortened. 

 

To clean the heat meter (only if necessary) use a slightly moist cloth. 

 

To protect against damage and dirt the heat meter should only be removed from the packaging directly 
before installation. 

 

If more than one heat meter is installed in one unit, care must be taken to ensure that all meters have 
the same installation conditions. 

 

All specifications and instructions listed on the data sheet and in the application notes must be adhered, 
further information can be obtained at 

www.kimans.com

 

Summary of Contents for HYDRASONIC S8

Page 1: ...personnel Violation and removal of the manufacturer s seals is not allowed otherwise the warranties are void Welding on pipes near the meter is prohibited The device must be dismounted before welding...

Page 2: ...Installation of the meter 4 2 2 Installation angle 5 2 3 Straight inlet 5 2 4 Installation of temperature sensors 6 2 5 Temperature sensor pocket installation 6 3 Installation procedure 7 4 Lay length...

Page 3: ...irective on Electromagnetic Compatibility EMC Directive 2014 30 EU The identification plate of the instrument and the seals must not be removed or damaged otherwise the guarantee and the approved appl...

Page 4: ...ipe section Use gaskets between mating flanges on pipe and meter The meter can be installed in supply or return flow lines Please consult with factory on ordering to program the meter for either the s...

Page 5: ...eter will a straight inlet section be necessary We recommend following the guidelines in CEN CR 13582 Optimal position can be obtained by taking the below mentioned installation methods into considera...

Page 6: ...nsor in cold line o Red sensor in hot line The temperature sensors are to be installed symmetrically in the supply and return line The free temperature sensor can be installed in a pocket conforming t...

Page 7: ...Check the display for flow rate and temperature Seal the sensors Attach the seals to the calculator and temperature sensors Read the meter counts for energy volume and operating hours Ensure no errors...

Page 8: ...y At the start you are automatically in the main loop 1st level By pressing the push button longer than 4 seconds you change to the next display loop Keep the push button pressed until you reach the d...

Page 9: ...5 1 Overall Menu Structure...

Page 10: ...5 2 Main Display Short press 3 sec Long press 3 sec...

Page 11: ...5 3 Test Display...

Page 12: ...5 4 Information Display...

Page 13: ...5 5 Error Display...

Page 14: ...Kimans Inc www kimans com...

Reviews: