3-44 Basic Operations
TOS9200/9201
3.7
Connecting the Test Leadwire
•
It is extremely dangerous to connect the test leadwire incorrectly, as the
DUT may be charged to an excessively high voltage. Be sure to make con-
nections securely.
3.7.1
Connecting the test leadwire to the tester
■
Connecting the lo
w-v
olta
ge
test lead
wire
1.
Chec
k f
or a disconnection in the test leadwire
.
2.
Connect the lo
w-v
oltage test leadwire to the tester’
s LO
W ter
minal.
Fig.3-16
Connecting the lo
w-v
oltage test leadwire
■
Connecting the high-v
olta
ge
test lead
wire
After connecting the lo
w-v
oltage test leadwire, follo
w the procedure speci
fi
ed
belo
w
.
Connection pr
ocedure
1.
Press the ST
OP s
witch.
2.
Con
fi
r
m that the analog v
oltmeter indicates
“0.
”
3.
Con
fi
r
m that the D
ANGER lamp is off
.
4.
Connect the high-v
oltage test leadwire to the HIGH
V
OL
T
A
GE ter
minal.
5.
Shor
t-circuit the lo
w-v
oltage and high-v
oltage test leadwires
, and con
-
fi
r
m that no high v
oltage is output.
3.7.2
Connecting a DUT
After connecting the lo
w-v
oltage and high-v
oltage test leadwires, connect a DUT by
follo
wing the procedure speci
fi
ed belo
w
.
WARNING
LOW terminal
Test lead wire (black) to the DUT housing
Fix the test leadwire mounting
guard.
Summary of Contents for TOS9200
Page 22: ...P 10 Preface TOS9200 9201...
Page 116: ...3 78 Basic Operations TOS9200 9201...
Page 130: ...4 14 Using Terminals and Connectors TOS9200 9201...
Page 148: ...7 4 Maintenance TOS9200 9201...
Page 162: ...8 14 Specifications TOS9200 9201...
Page 170: ...I 4 Index TOS9200 9201...
Page 171: ......