48
TOS5200
Starting a Test
To start a test
1
Check that the TOS5200 is correctly connected to the DUT.
2
When the READY LED lights in white, press START.
If the test does not start, see “If you cannot start testing”.
If you want to start another test after testing finishes, set a wait time between tests as neces-
sary.
When a test starts
The TEST and DANGER LEDs light. The TEST LED lights in red.
If the start voltage and the voltage rise time have been set
After the voltage rises to the start voltage or after the voltage rise time elapses, the TEST
LED lights in red, and the test starts. While the voltage is rising, the TEST LED blinks in red,
and the display counts up to the set rise time.
WARNING
Risk of electric shock. During testing, do not touch the test leads and the DUT.
START
A
kV
M
ȍ
mA
CONFIG
RISE TEST
RMS
AVE
MORE CAL RMT
MT
LIMIT
50Hz
60Hz
UPPER
LOWER W COMP
s
1
2
3
READY
TEST
PASS
FAIL
PROTECTION
See
See
OUTPUT
DANGER
Lit
Lit
The TEST and DANGER LEDs light.
The TEST LED lights in red.
TEST
See
A
kV
M
ȍ
mA
CONFIG
RISE
TEST
RMS
AVE
MORE CAL RMT
MT
LIMIT
50Hz
60Hz
UPPER
LOWER W COMP
s
1
2
3
READY
TEST
PASS
FAIL
PROTECTION
Counts up the
voltage rise time
Blinking
Summary of Contents for TOS5200
Page 7: ...TOS5200 7 C Test Start Operation and Display 75 D Troubleshooting 76 Index 79 ...
Page 18: ...18 TOS5200 This page is intentionally blank ...
Page 19: ...Installation and Preparation This chapter describes how to prepare this product for use ...
Page 60: ...60 TOS5200 This page is intentionally blank ...
Page 61: ...Maintenance This chapter explains daily inspections such as measurement checks ...
Page 78: ...78 TOS5200 This page is intentionally blank ...
Page 80: ...80 TOS5200 V version 2 Volt Error Protection 74 W W COMP 32 40 warm up time 64 ...
Page 81: ......