Verification and Performance Tests
5
Input Connections
U3606A User’s and Service Guide
147
Gain verification test setup
Figure 5-2
Test setup for DC voltage, AC voltage, resistance, and capacitance gain
verification
Figure 5-3
Test setup for DC current and AC current gain verification
Calibrator
Calibrator
Alternate connection path
Summary of Contents for U3606A
Page 1: ...Keysight U3606A Multimeter DC Power Supply User s and Service Guide ...
Page 2: ......
Page 12: ...12 U3606A User s and Service Guide ...
Page 128: ...3 DC Power Supply Operation Remote Sensing 106 U3606A User s and Service Guide ...
Page 160: ...4 System Related Operation Remote Operation 138 U3606A User s and Service Guide ...
Page 242: ...6 Calibration Procedures Adjustments procedures 220 U3606A User s and Service Guide ...
Page 291: ...List of Error Messages 9 Error Messages U3606A User s and Service Guide 269 ...