
32
Keysight Instrument Rack E7950A-1.3m E3661B-1.6m E3662B-2.0
Procedures
Figure 16
Positioning the Ramp
10
Raise the leveling feet all the way up before moving the rack.
Repackaging the Rack for Shipment
Use the original packing material to repackage the empty rack for shipment.
Before shipment, securely place a tag on the container (and equipment) to
identify the owner and the service to be performed. Include the rack model
number.
To repackage the rack, follow the repackage checklist below, and refer to the
unpacking instructions for details.
1
Assemble the original Keysight packing materials.
2
Connect the loading ramp to the pallet.
Make sure that the leveling feet on the rack are raised before you
roll the rack down the ramp, and any time you roll the rack on the
casters.