Installation Note E8356-90001 17
In This Guide
Installing Your Analyzer
Step 6. Start Up the Analyzer
1. Connect the AC power cable.
Figure 5
2. Turn the analyzer on by pressing the front panel On/Standby switch.
Install the instrument so that the detachable power cord is readily
identifiable and is easily reached by the operator. The detachable power
cord is the instrument disconnecting device. It disconnects the mains
circuits from the mains supply before other parts of the instrument. The
front panel switch is only a ON/Standby switch and is not a LINE (OFF)
switch. Alternatively, an externally installed switch or circuit breaker
(which is readily identifiable and is easily reached by the operator) may be
used as a disconnecting device
Do NOT press keys on the front panel, rotate the RPG knob, or connect a
USB device during boot up of Windows or of the PNA application program.
Doing so may lead to a front panel lockup state.