16
Keysight Double-Pulse Test Rack and Safety Enclosure Operation Guide
Introduction
Plan the Rack and Safety Enclosure Site Installation
protective covering is removed. Inspect the rack for damage (scratches, dents,
bent pieces, etc.). If the rack is damaged, notify the carrier and the nearest
Keysight Technologies Sales and Service office immediately.
PD1500A Double-Pulse Tests System Installation Plan
The Rack and Safety Enclosure is a free-standing rack with test instruments
installed in the rack and a Safety Enclosure on top. It is the customer’s
responsibility to consider the anticipated location and requirements to ensure
safety and optimize access to test and control instrumentation.
The following figure shows a typical layout for the Rack and Safety Enclosure.
Allow a minimum one meter of space in front of the rack for operator access, 50
cm of space behind the system for ventilation and a minimum of 50 cm on either
side of the rack for sufficient air flow and cable egress (right side).
Allow a minimum of one meter above the Rack and Safety Enclosure for opening
the Safety Enclosure hood.
Operator Area
(for example purposes only.
The operator does not have to
be in front of the test system.)
Instrument and
Service Access Area
(minimum required for
ventilation)
100 cm (39.4 in)
50 cm
(20 in)
50 cm
(20 in)
Rack Front
Keysight
Double Pulse Rack
and Safety Enclosure
(top view)
Summary of Contents for PD1500A