Getting Started
Power Requirements
11
Power Requirements
The AC power supplied must meet the following
requirements:
The AC/DC power supply charger adapter supplied with
the analyzer is equipped with a three-wire power cord, in
accordance with international safety standards. This
power cord grounds the analyzer cabinet when it is
connected to an appropriate power line outlet. The
power cord appropriate to the original shipping location
is included with the analyzer.
Various AC power cables are available from Keysight that
are unique to specific geographic areas. You can order
additional AC power cords are correct for use in different
areas. The AC Power Cords table provides a lists of the
available AC power cords, the plug configurations, and
identifies the geographic area in which each cable is
typically used.
The detachable power cord is the product disconnecting
device. It disconnects the main AC circuits from the DC
supply before other parts of the product. The front-panel
switch is only a standby switch and do not disconnect
instrument from AC LINE power.
Voltage:
100 VAC to 240
VAC
Frequency:
50/60 Hz
Power:
Maximum 80 W
Summary of Contents for N9340B
Page 7: ...1 Overview 1 Overview ...
Page 42: ...System and File File 36 ...
Page 43: ...37 Making Measurements 4 Making Measurements ...
Page 150: ...Error Messages Error Message List 144 ...
Page 154: ...Troubleshooting Contact Keysight Technologies 148 Contact Keysight Technologies ...
Page 157: ...Menu Map AMPTD 151 ...