26 N5511A Phase Noise Test System User’s Guide
Introduction
Powering the System On
Powering the System On
Connect your system to an appropriate AC power source using the power cord
provided.
The N5511A system is shipped with an AC power cord appropriate for your
location.
The N5511A Benchtop system consists of an N5511A Phase Noise Test System
with one or two test sets installed. You must connect a monitor, keyboard, and
mouse before powering on the system.
Press the system power switch.
Figure 2-2
Power on the N5511A System
To power on a racked system
1.
Press the system power switch (front, top right of the rack) to the on
position.
2.
Verify that all instrument power switches are on.
3.
Allow the system to warm up for 30 minutes.
Before applying power, make sure the AC power input and the location of the system meet the
requirements given in the Getting Started guide for your system. Failure to do so may result in
damage to the system or personal injury.
Warm-up Time: The downconverter and RF source instruments contain ovenized oscillators
which must warm up for 30 minutes to produce accurate measurements.
Standby Mode: The RF source uses a standby mode to keep the ovenized oscillator warm when
the instrument is connected (plugged in) to AC power, even when the power switch is in the off
position. To completely shut down the instrument, you must disconnect it from the AC power
supply.
Summary of Contents for N5511A
Page 1: ...User s Guide Keysight N5511A Phase Noise Test System...
Page 4: ...4...
Page 11: ...Contents N5511A Phase Noise Test System User s Guide 11...
Page 12: ...12 N5511A Phase Noise Test System User s Guide Contents...
Page 38: ...38 N5511A Phase Noise Test System User s Guide Phase Noise Basics What is Phase Noise...