C
HAPTER
3
Unpacking and inspection
Carefully unpack the APS System components. Each node that is described below is shipped in its
own box.
1 Management Node (APS-M1010)
l
A 1U Management Server
l
2 power cords
l
2 tool-less rackmount slide rails
l
1 Micro USB to USB cable
Up to 10 Compute Nodes (APS-ONE-100)
Each box contains:
l
A compute node
l
2 power cords
l
1 Ethernet cable 3 ft.
l
2 tool-less rackmount slide rails
– 8 –
Ixia APS-M1010/APS-ONE-100