![Keysight Technologies E7760A Getting Started Manual Download Page 17](http://html1.mh-extra.com/html/keysight-technologies/e7760a/e7760a_getting-started-manual_1962396017.webp)
Getting Started Guide 17
Quick Start
Location and Mounting
Shipping Problems?
If the shipping materials are damaged or the contents of the container are
incomplete:
— Contact the nearest Keysight Technologies office.
— Keep the shipping materials for the carrier’s inspection.
— If you must return a test set to Keysight Technologies, use the undamaged
original or comparable shipping materials. See
.
Location and Mounting
It is recommended to suspend the transceiver above the Device Under Test
(DUT), with the mmWave port pointed downwards at the DUT, so that heat
given off by the external cooling fins of the transceiver will rise away from the
DUT. Leave a minimum clearance of 2.5 inches (7 cm) around the transceiver.
Also, ensure there is enough room to attach the RF Cable Assembly, which
connects to the M1650A mmWave Transceiver to the E7760A Wideband
Transceiver.