background image

 16                                                                                        Keysight E5055A SSA-X Signal Source Analyzer 

Installation
Power Supply

1-

Power Supply

Before turning on the E5055A power, check the following.

Verification of the Power Supply

Confirm that the power supplied to the E5055A meets the following 

requirements:

Verification and Connection of Power Cable

The three-wire power cable attached to the E5055A has one wire serving as a 

ground. Using this power cable allows the E5055A to be grounded, thereby 

protecting you against electrical shock from the power outlet.

Step 1. Confirm that the power cable is not damaged.

Step 2. Use the supplied cable to connect between the power cable receptacle 

(

Figure 1-2 on page 19

) on the rear panel of the E5055A and a three-wire 

power outlet with the grounding prong firmly connected in the ground slot.

For power cord list and options, refer to 

www.keysight.com/find/powercords

.

Requirements

Voltage

100 to 240 VAC 

Frequency

50/60 Hz

Maximum power consumption

500 W

NEVER use a power cable showing any sign of damage. Faulty cables can 

cause electrical shock.

Use the supplied power cable with grounding wire to securely ground the 

E5055A. 

Summary of Contents for E5055A SSA-X

Page 1: ...Installation Guide Keysight E5055A SSA X Signal Source Analyzer...

Page 2: ...ided to the public Accordingly Keysight provides the Software to U S government customers under its standard commercial license which is embodied in its End User License Agreement EULA a copy of which...

Page 3: ...erature or electrical shock during operation Power cable plug or receptacle on instrument is damaged Foreign substance or liquid has fallen into the instrument Do not exceed the operating input power...

Page 4: ...the CE marking accordingly The Low Voltage Directive 2014 35 EU The EMC Directive 2014 30 EU The RoHS Directive 2011 65 EU To obtain Declaration of Conformity please contact your local Keysight Techn...

Page 5: ...als to mains This equipment is a POLLUTION DEGREE 2 INDOOR USE product This equipment is tested in stand alone condition and in combination with the accessories supplied by Keysight Technologies again...

Page 6: ...y from Live Circuits Operators must not remove instrument covers Component replacement and internal adjustments must be made by qualified maintenance personnel Do not replace components with the power...

Page 7: ...certifies that its calibration measurements are traceable to the United States National Institute of Standards and Technology to the extent allowed by the Institution s calibration facility or by the...

Page 8: ...rnishing use or performance of this document or any information contained herein Should Keysight and the user have a separate written agreement with warranty terms covering the material in this docume...

Page 9: ...elp hard key on the front panel to open Quick Start helps in understanding the E5055A operation quickly The latest version of online help is available at http www keysight com manuals e5055a The onlin...

Page 10: ...10 Keysight E5055A SSA X Signal Source Analyzer Caution Manuals for E5055A...

Page 11: ...equirements 14 Operating Environments 14 Ventilation Requirements 14 Protection Against Electrostatic Discharge ESD 15 Ensuring Adequate Free Space around Analyzer for Immediate Disconnection of Power...

Page 12: ...12 Keysight E5055A Installation Guide Contents...

Page 13: ...e specified options Step 4 After checking if one of the following applies contact your nearest Keysight Technologies sales and service office 1 The packing box or shock absorbing material used to pack...

Page 14: ...y providing appropriate cooling clearance around the analyzer or for the rack mount type by forcefully air cooling inside the rack housing For more information on environmental temperature to satisfy...

Page 15: ...e by the electrostatic discharge ESD as shown in Figure 1 1 Figure 1 1 Example of the static safe work station Ensuring Adequate Free Space around Analyzer for Immediate Disconnection of Power Cable i...

Page 16: ...you against electrical shock from the power outlet Step 1 Confirm that the power cable is not damaged Step 2 Use the supplied cable to connect between the power cable receptacle Figure 1 2 on page 19...

Page 17: ...ng operation this instrument may be subject to failure and must be repaired For any assistance contact Keysight Technologies Customer contact center listed at the end of this guide The E5055A uses the...

Page 18: ...or send a shutdown command from the external controller to activate the shutdown process the process of software and hardware necessary to turn OFF the power supply This puts the E5055A into the stand...

Page 19: ...ecessary to disconnect the power supply in order to avoid shock hazards etc pull out the power cable plug from either the AC outlet side or the E5055A side To allow this operation to be performed smoo...

Page 20: ...rt up the E5055A for the first time you need to perform the initial registration of the Windows operating system of the E5055A When the Windows agreement message box appears click Agree The rest of th...

Page 21: ...ting during startup Symptom Solution Turning on the standby switch does not start up the system Confirm that the power cable is properly plugged in The system starts up but it automatically shuts down...

Page 22: ...ting o The driver for the supported printer installed after purchase is deleted o You need to execute initial registration again Files that you have created using the save function files in the D driv...

Page 23: ...USB ports Step 3 Connect the keyboard to the E5055A Step 4 Press the standby switch of the E5055A to turn it ON Step 5 When the windows boot manager screen appears select Instrument Image Recovery Sys...

Page 24: ...instructions to finish the recovery The recovery takes a few minutes depending on the amount of data If the Software End User License Agreement appears during the system recovery Press Agree Never tu...

Page 25: ...peration environment 14 ventilation space 14 error correction temperature range 14 Exclusive Remedies 8 I Inspection checking the shipment 13 P power check the power supply 16 disconnection from suppl...

Page 26: ...Keysight E5055A Installation Guide Index 26...

Page 27: ...This information is subject to change without notice Keysight Technologies 2022 Edition 1 March 2022 www keysight com...

Reviews: