3
Measurement Clock Tests
38
DDR2(+LP) Compliance Testing Methods of Implementation
Cumulative Error - tERR(n per) - Test Method of Implementation
This Cumulative Error (across “n” cycles) test is applicable to the Rising Edge Measurement as well
as the Falling Edge Measurement. The purpose of this test is to measure the difference between a
measured clock period and the average clock period across multiple cycles of the clock. Supported
measurements include multiple cycle windows with values of "n" (for "n" cycle) where n>5 but less
than 50.
Signals of Interest
Mode Supported: DDR2, LPDDR2
Signal cycle of interest: READ or WRITE
Signal(s) of Interest:
• Clock Signal
Signals required to perform the test on the oscilloscope:
• Pin Under Test, PUT - any signal of interest, as defined above
Test Definition Notes from the Specification
Table 8
Specific Note 35
Parameter
Symbol
DDR2-667
DDR2-800
Units
Notes
min
max
min
max
Cumulative error across 2 cycles
tERR(2per)
-175
175
-150
150
ps
35
Cumulative error across 3 cycles
tERR(3per)
-225
225
-175
175
ps
35
Cumulative error across 4 cycles
tERR(4per)
-250
250
-200
200
ps
35
Cumulative error across 5 cycles
tERR(5per)
-250
250
-200
200
ps
35
Cumulative error across n cycles, n = 6....10,
inclusive
tERR(6-10 per)
-350
350
-300
300
ps
35
Cumulative error across n cycles, n = 11...50,
inclusive
tERR(11-50 per)
-450
450
-450
450
ps
35
Table 9
Specific Note 30
Parameter
Symbol
DDR2-1066
Units
Notes
min
max
Cumulative error across 2 cycles
tERR(2per)
-132
132
ps
30
Cumulative error across 3 cycles
tERR(3per)
-157
157
ps
30
Cumulative error across 4 cycles
tERR(4per)
-175
175
ps
30
Cumulative error across 5 cycles
tERR(5per)
-188
188
ps
30
Cumulative error across n cycles, n = 6....10, inclusive
tERR(6-10 per)
-250
250
ps
30
Cumulative error across n cycles, n = 11...50, inclusive
tERR(11-50 per)
-425
425
ps
30
Summary of Contents for D9020DDRC
Page 1: ...Keysight D9020DDRC DDR2 LP Compliance Test Application Methods of Implementation ...
Page 10: ...10 DDR2 LP Compliance Testing Methods of Implementation ...
Page 46: ...2 Preparing to Take Measurements 30 DDR2 LP Compliance Testing Methods of Implementation ...
Page 70: ...3 Measurement Clock Tests 54 DDR2 LP Compliance Testing Methods of Implementation ...
Page 224: ...14 Clock Timing CT Tests 208 DDR2 LP Compliance Testing Methods of Implementation ...
Page 270: ...15 Data Strobe Timing DST Tests 254 DDR2 LP Compliance Testing Methods of Implementation ...