
YDB-03-BA-e-2114
17
4.3.2 Installing the density determination set
Insert frame in the weighing compartment. The round opening above at the frame
has to point into the direction where the immersion basket is inserted from.
Put the supporting platform of the glass beaker through the frame on the weighing
compartment floor. Place it in a way that it does not touch the frame.
If necessary place compensation weights on the frame, see allocation list chap.
4.1. If when the balance is switched on, the error message „underload“ appears,
use only the compensation weights suitable for the respective balances.
Hang the immersion basket on the rack. Make sure that it is centred in the recess.
Close the glass doors. Connect the balance to the power supply and switch on.
Bring liquid and instruments to the right temperature until you achieve a constant
temperature. Observe the warm-up time of the balance.
To avoid corrosion, don't leave the density set immersed in liquid for a long time.