10.5. Assembly & Programming (commissioning)
10.5.1.
Installation Wireless SmartMeter
The installation is done in following steps:
Commissioning with 3-phase installation method
No
Description
1
Interrupt power supply. For the duration of the electrical work, the power supply for the entire work area must be
disconnected by switching off the corresponding fuses.
2
Place the radio smart meter on the DIN rail. Make sure that it engages correctly.
3
Remove 11mm of the cable insulation at the supply and output lines with a suitable wire stripper.
4
Connect the cables to the Wireless Smart Meter according to the following wiring diagram.
5
Mount the antenna.
6
Restore power.