
GENERAL INFORMATION
ENGLISH
SERVICE MANUAL
8
909 6577 000(4)2009-11
Razor SV17 - Razor E17
MAINTENANCE
SCHEDULED MAINTENANCE
The lifespan of the machine and its maximum operating safety are ensured by correct and regular maintenance.
See the GENERAL INFORMATION and SAFETY paragraphs.
Provided below is the Scheduled Maintenance Table. The intervals shown may vary according to particular working conditions,
which are to be defined by the person in charge of the maintenance.
For instructions on maintenance procedures, see the following paragraphs.
SCHEDULED MAINTENANCE TABLE [Razor SV17]
Procedure
Daily or after
using the
machine
Weekly
Every six
months
Yearly
Squeegee cleaning
Brush cleaning
Tank and vacuum grid with float cleaning
Battery charging
Squeegee blade check (and replacement)
Solution filter cleaning
Battery (WET) fluid level check
Screw and nut tightening check
(1)
Brush motor carbon brush check or replacement
Vacuum system motor carbon brush check or replacement
(1): and after the first 8 working hours
SCHEDULED MAINTENANCE TABLE [Razor E17]
Procedure
Daily or after
using the
machine
Weekly
Every six
months
Yearly
Squeegee cleaning
Brush cleaning
Tank and vacuum grid with float cleaning
Squeegee blade check (and replacement)
Solution filter cleaning
Screw and nut tightening check
(1)
Vacuum system motor carbon brush check or replacement
(1): and after the first 8 working hours