- 60 -
After reset the unit, take steps to PWB as
follows for temperature compensation.
+1.0 deg
JCR2
Cutting both jumpers affords a 2¼
temperature compensation
+1.0 deg
JCR1
Temp.
Compensation
JUMP
WIRE
* Cutting of jumper wire
Enter the TEST 3 MODE
Is the voltage between
Pins 4 and pin 12 of
CON3 like as below?
0~2 V
Pin4 To pin12
Result
Test Point
Voltage of Compressor
Yes
Yes
Pin12 BK
CON3
Pin4 BL
1. In the case of EBR419564
: Compensate with Jump wire cutting
Replace
MAIN PWB
(Position No:
500A)