K410068602008-00 / 09.2018
14
Commissioning
Before commissioning, make sure the
connections have been made properly and
professionally and that the system is
properly
protected.
The
pertinent
regulations (EN, VDE, etc.) and the
regulations of the local energy utility must
be complied with. After finishing the wall
installation and the electrical installation,
apply the mains voltage of 230V.
Allow only certified electricians to assemble and install electrical equipment.
Danger of fatal electric shock.
To simplify configuration and to guarantee correct installation, fill in the
system commissioning overview of the KHS Mini Control System (see supply
pressure, Chapter 10.2) before making the settings.
It is mandatory to fill in the form
to be able to take advantage of the
optional factory support.
All menus have a "rolling" structure, i.e.,
pressing the "
↓
key" on the last menu item
jumps back to the first menu item.
Keys
Description
Esc
Exit the menu / switch between overview and main menu
Roll backwards
OK
Confirm key
Roll forwards
The menu navigation of the KHS Mini Control System
–
MASTER 2.0
–
is divided in two types of
windows.
Window types
Description
General plan
The "General plan" window is used only for visualising the current
states. Viewing possible without password.
Main menu
Preset parameters can be viewed, changed and saved. Viewing not
possible without password.