S540 Power Semiconductor Test System Administrative Guide
Section 2: S540 site preparation and installation
S540-924-01 Rev. D / January 2019
2-3
The following information will help the FSE unpack the system. Series 500 systems are shipped in a
wooden crate (see the following figure).
Figure 1: S540 system cabinet in shipping crate
Unpacking system components
Inspect the shock sensor on the outside of the shipping crate (see the following figure). If the shock
sensor indicates a shock condition, do a thorough inspection of all components in the system cabinet.
Figure 2: S540 crate shock sensor