4-12
Return to
4200-900-01 Rev. K / February 2017
Section 4: How to Control Other Instruments with the Model 4200-SCS
Model 4200-SCS User Manual
Running test sequences
NOTE
For detailed information about test and sequence execution, refer to the
Manual, Run execution of individual tests and test sequences, page 6-162
The ivswitch project uses the same ITMs that are used in the default project. The primary
difference between the two projects is that the ivswitch project uses connect UTMs to control the
switch matrix. As shown in
, there is a connect UTM at the beginning of each device
test sequence.
A test sequence for a device is executed by selecting the device plan, and then clicking the green
Run
button
.
When a device plan is started, the connect test closes the appropriate matrix crosspoints to
connect the instruments to the appropriate device.
All devices may be tested by selecting the
Subsite Plan
and clicking the green
Run
button
.
through
show the signal paths that are automatically selected for the five
devices.
Figure 4-14
Signal paths for 4terminal-n-fet tests
Figure 4-15
Signal paths for 3terminal-npn-bjt tests
Gate
Source
D
rain
Substrate
N-C
h
annel
MOS
F
E
T
1
2
3
4
5
6
7
8
9 1
0
11 1
2
A
B
C
D
S
M
U
1
S
M
U2
S
M
U3
GN
D
U
NPN
Transistor
Base
Emitter
1
2
3
4
5
6
7
8
9
10 11 12
A
B
C
D
Collector
SMU1
SMU2
SMU3
GNDU
Summary of Contents for 4200-SCS
Page 2: ......
Page 4: ......
Page 334: ...Index 6 4200 900 01 Rev K February 2017 Model 4200 SCS User s Manual Index...