9
2.0 Installation
This chapter will instruct how to unpack and prepare the
TonoCare for use.
When you open the package, check for any external
damage or flaws, particularly damage to the case. If you
suspect there is something wrong with the tonometer, contact
the manufacturer or distributor.
2.1 Tools Required
• Safety knife
For wall mounting:
• Pencil
• Spirit Level
• Electric drill
• PH1 screwdriver
2.2 Packaging Content
Your TonoCare has been supplied with:
• A hand unit with pre-installed battery for IOP standalone
measurement.
• A docking station for printing, data export and charging
functions.
• A metal wall mounting plate with 4 screws and 4 rawlplugs
for wall mounting of the docking station.
• A power supply for directly charging the hand unit (in
transport) or via the docking station.
• A roll of thermal paper to be used in the printer located in
the docking station.
• A USB device containing the Instructions For Use.
• An extendable forehead stabilizer.
• A USB cable to connect the docking station with a computer
(not provided) for data export.
Summary of Contents for Tonocare
Page 1: ...Next Next ...