
Operation Manual ServoOne Supply Unit
42
ID no.: 1101.21B.6-00 Date: 04/2020
ServoOne DC BG
1
ServoOne DC BG
2
ServoOne DC BG
3
ServoOne DC BG
4
ServoOne DC BG
5
PE
PE
X11
PE
X11
PE
X11
PE
X11
PE
X11
PE
X11
ServoOne DC BG6a
with liquid cooling
ServoOne
Supply unit BG7
with liquid cooling
Figure 4.16 Schematic: connection of the protective earth conductor with supply unit BG7
4.5.4
Protective earth conductor connection other components
1.
Connect the PE connections on all other components, such as mains filters, chokes
etc. in a star topology to the PE rail (main earth) in the switch cabinet. During this
process also take into account the instructions in chap. 4.5
DANGeR!
Risk of injury due to electrical power!
•
Carelessness will result in serious injuries or death.
Never make or disconnect electrical connections while they are electrically live! Before making
any change
the device is to be disconnected from the mains. Dangerously high voltages ≥50 V can be
present on the DC link connections and other components in the mains input area after power
off. So check that electrical power is not present! See chap. 4.1
Figure 4.15 Detail: connection of the protective earth conductor
4.5.3
Protective earth conductor (X11) supply unit BG7
1.
Earth the supply unit and each DC axis controller BG7 and BG6a separately!
Connect the PE connection X11/PE on the supply unit to the PE rail (main earth) in
the switch cabinet.
Select the protective earth conductor cross-section according to chap. 4.5.
2.
Earth all other DC axis controllers BG5 to BG1 via a common protective earth
conductor! Connect in series all other PE connections X11/PE on the butt-mounted
DC axis controllers.
Connect the PE connection X11/PE on the first DC axis controller in a row to the PE
rail (main earth) in the switch cabinet.
For this purpose use the pre-assembled protective earth conductors.
Electrical installation
Summary of Contents for ServoOne Series
Page 6: ...Operation Manual ServoOne Supply Unit 6 ID no 1101 21B 6 00 Date 04 2020 Table of contents ...
Page 10: ...Operation Manual ServoOne Supply Unit 10 ID no 1101 21B 6 00 Date 04 2020 ...
Page 90: ...Operation Manual ServoOne Supply Unit 90 ID no 1101 21B 6 00 Date Date 04 2020 Glossary ...
Page 91: ...Operation Manual ServoOne Supply Unit 91 ID no 1101 21B 6 00 Date 04 2020 ...