Chapter 10: Sensor Verification
Kaye ValProbe RT User Manual
93
10.3. Loading a Verification Setup
Before you begin the Verification process, you must load your setup into the ValProbe RT
loggers. A Kaye IRTD must be used to execute a Verification study. Please connect it and the
Temperature bath / Drywell to the Base Station connectors on the rear of of the Base Station.
Each connector is marked with the appropriate icon. Utilize the supplied cables for the
connection. Power up the connected bath.
IMPORTANT: If a calibration bath is not connected to the ValProbe RT base station, only a
manual calibration can be performed. A fully automated calibration is only
possible if a KAYE IRTD and a KAYE calibration bath is connected to the Base
Station. Please ensure that the correct port is used for each instrument.
.
Figure 101: Connecting a Bath to the Base Station
To load a setup:
From the Main Menu navigate to the
Equipment / Setup/ Temperature
Verification
and
select a setup from list of available setups.
After highlighting the required Verification Setup, click
Select Basestation
.
Figure 102: Select a Verification Setup from List
On the Select Base Station screen, click
Discover Base Station
, available devices are
displayed. If there is an issue during discovery, ensure that the base station and Validation
Console are properly connected
Summary of Contents for ValProbe RT
Page 1: ...Validation Kaye ValProbe RT User Manual MXXX EN Rev 1 0 May 2020 ...
Page 2: ... No content intended for this page ...
Page 4: ... No content intended for this page ...
Page 12: ......
Page 163: ...Kaye ValProbe RT User Manual 150 ...
Page 166: ... No content intended for this page ...