
C O N T R O L C E N T R E
where
:
switchN
–
is the optional command line switch of Control Centre
.
You can use more than one switch in the Control Centre command
line. For the complete list
of available command line switches refer to
subchapter 16.8 Appendix B.
14.3. Scheduling
performance
of package component-based
tasks
You can schedule a task to be performed once within the current Control
Centre session. You can also define and edit the schedule for tasks to be
performed within the required period.
Creation and editing of the task performance schedule is performed from
the command line. The general format of the task-scheduling command
line is:
./kavucc instruction1=["task_parameters"] […] [instructionN=["task_parameters"]]
Before you begin scheduling performance of the Kaspersky Anti-
Virus for xBSD Mail Server tasks, you must launch the Control Cen-
tre program (for details on the Control Centre command line refer to
subchapter 14.2).
To schedule a task to be performed once within the current
Control Centre session,
enter the following strings in the command line:
./kavucc -cp="prgname -a:arg[:arg1[…]] -u=username
-e=hour:min"
228