INSTALLATION MANUAL OPERATION MANUAL INSPECTION LOG
KANNAD 406 AF / AF-H / AF (6D)
PAGE: 303
JUN 23/2008
3. RCP operational tests
Check correct operation of RCP LED and external buzzer by switching ELT and
RCP as described in the sequential procedure hereunder (with ELT switch in
the "ARM" position).
Figure 301: RCP LED and buzzer operation
IMPORTANT: (2) before switching the RCP to ON, wait for the end of the
self-test.
Summary of Contents for 406 AF
Page 51: ......