16
Kamstrup A/S • 55122714_A2_GB_04_2021
flowIQ® Gateway
6.3 Plugging in communication module(s)
Before replacing or mounting modules, the supply to the meter must be switched off.
The same applies for mounting of an antenna.
If the modules are ordered with flowIQ® Gateway, they are factory-mounted.
The communication modules are factory-mounted if
ordered with flowIQ® Gateway.
If ordered separately, mount the modules as shown.
The communication modules are programmed with a data
package at the factory and will send data according to the
chosen package.
6.3.1 Antenna mounting
All radio-based modules must have either an internal or external antenna connected.
When mounting an external antenna, please ensure that the antenna cable is arranged as shown
to prevent damage of the cable when the gateway is assembled.
Before opening the gateway to mount a module or an antenna, the power supply must be
disconnected.
Wireless M-Bus module with internal antenna.
Wireless M-Bus module with external antenna.