Page 9 of 16
2019
/09
/11
K&K Single point swing # 040720001 - Instruction
Four weeks after installation, all screw connections must be checked and tightened
if necessary. In this case, the specified advice in the regular maintenance work e. g. to
turning moments has to be observed.
1-1. 1x weekly (or different, determined by local factors)
• Check the minimum space of the playground equipment for cleanliness.
• Check playground equipment for consequences of vandalism, e. g. missing or
• Check playground equipment for the effects of weather conditions, eg. B. by
2-1. 1x monthly (or different, determined by local factors)
• Check for visibility of the warning groove (red-colored ring on the swivel hou-
• Testing for smoothness of running. Relieve the swing platform and the uni-
versal joint from load. To check the swivel is slowly put into rotation by hand. If
the swivel rotates without angular offset (well visible on the swing chains), it is
• Check swing chains and connecting elements for wear, replace if necessa-
• Check plastic parts such as protective edges, linings, sheathing, sleeves, etc.
for loss, signs of wear and damaged areas and replace if necessary.
• Check the condition of the ground surface, if applicable, follow the instructions
• Check the ground clearance of the swing platform.
Kaiser & Kühne Freizeitgeräte GmbH
Im Südloh 5 - 27324 Eystrup
+49 4254 93150