10.15 Documenting maintenance and service work
Machine number:
➤ Enter maintenance and service work carried out in the list.
Date
Maintenance task carried out
Operating hours
Signature
Tab. 39 Logged maintenance tasks
10 Maintenance
10.15 Documenting maintenance and service work
No.: 9_5753 24 E
Assembly and operating manual 2-stage piston compressor
EPC-2-G
77