background image

hy-switch for KACO blueplanet hybrid inverters

 

Page 13

 

 

 

5.

 

Technical data 

5.1.

 

Electrical data 

 

isolator switch 

hy-switch 

Max. isolation voltage 

264 V 

Max. load current 

50 A 

Max. continuous power 

30 000 W 

Grid failure detection 

200 ms 

Switchover time from grid to standalone mode  < 3 s (depending on test sequence) 

Current counter 

Measuring range of internal current sensors 

35 A RMS 

Measuring range of external current sensors 

70 A RMS 

Measuring accuracy of AC power (internal) 

3% 

Measuring accuracy of AC power (external) 

5% 

Measuring speed 

Real-time 

Installation 

Max. cable length to the blueplanet hy-switch 

20 m 

AC cable cross-section max. 

35 mm² 

Communications connection 

1 x RJ45 (RS485) 

Connection for external current sensors 

3 x 3.5 mm jack 

General data 

Protection rating (IEC 60529) 

IP20 

Protection class (IEC 62109-1) 

Certificates 

VDE 0126, VDE AR-N 4105 

Warranty 

2 years 

Dimensions (W x H x D) 

170 x 280 x 92 mm 

Weight 

1.2 kg 

Supported devices 

Inverter 

blueplanet hybrid 10.0 TL3 

Max. number of inverters 

Tab. 1 Technical data 

 

5.2.

 

Environmental data 

 

 

blueplanet hy-switch 

Ambient temperature 

+5°C + 40°C 

Protection rating (KACO installation location) 

IP20 

Humidity range (non-condensing) [%] 

0 to 90 % 

Tab. 2 Environmental data 

Summary of Contents for blueplanet hy-switch

Page 1: ...nslation of German original Important safety instructions These instructions form part of the product and must be carefully read observed and stored in a place which is freely accessible at all times...

Page 2: ...t warranty conditions contact your system integrator You can download the current warranty conditions on the Internet at http www kaco newenergy com Definitions on product designations In these operat...

Page 3: ...delivery 14 6 2 Transporting the component 14 6 3 Installation tool 15 7 Assembly and preparation 16 7 1 Unpacking the component 16 7 2 Installing the component 16 8 Installation and start up 18 8 1 G...

Page 4: ...rs 11 Decommissioning and dismantling 32 11 1 Shutting down the component 32 11 2 Uninstalling the component 32 11 3 Disassembling the component 33 11 4 Packaging the component 33 11 5 Storing the com...

Page 5: ...ystem These instructions also apply to the equipment related components and other parts of the system Storing the documents These instructions and other documents must be stored near the system and be...

Page 6: ...arried out by an authorised electrician DANGER High risk Failure to observe this warning will lead directly to serious bodily injury or death WARNING Potential risk Failure to observe this warning may...

Page 7: ...sult of the action End result 2 3 Target group All activities described in the document may only be carried out by specially trained personnel with the following qualifications Knowledge about how an...

Page 8: ...e service and other setup specific requirements you will find the name plate with the following data on the left side panel of the product Product name Part no Serial number Date of manufacture Techni...

Page 9: ...age is present using suitable voltage tester Keep the component closed when in operation The electrician is responsible for observing all existing standards and regulations The following applies Keep...

Page 10: ...be met for grid connection to take place The permission of the relevant authorities may also be required in order to secure authorisation to connection to the grid The enclosed documentation is an int...

Page 11: ...cture of the subnetwork to be compensated in single family houses it is typically located at the grid connection point In addition the measuring point enables no electricity from the batteries connect...

Page 12: ...id inverters 4 3 Structure of the component Fig 2 Structure of the component with external connections Grid connection Building ti Ground PE external current sensor L3 external current sensor L2 exter...

Page 13: ...external 5 Measuring speed Real time Installation Max cable length to the blueplanet hy switch 20 m AC cable cross section max 35 mm Communications connection 1 x RJ45 RS485 Connection for external cu...

Page 14: ...e to the packaging that indicates that the component may have been damaged Obvious damage to the component 3 Send a damage report to the shipping company immediately 4 The damage report must be receiv...

Page 15: ...subject the component to any shocks 6 3 Installation tool The codes given in the table below are used in all usage instructions for assembly installation maintenance and disassembly for the tools and...

Page 16: ...3 Remove the component from the packaging 4 Place the protective packaging back into the carton Continue installing the component 7 2 Install the component Choosing the installation location Place the...

Page 17: ...ully separate the two 2 Store the cover plate carefully until installation is complete 3 Attach the four dowels with the hole dimensions 153 mm x 247 mm to the mounting wall cf Fig 3 Component is moun...

Page 18: ...itch off the grid voltage by turning off the external circuit breakers Do not touch the cables and or terminals busbars when switching the device on and off Keep the component closed when in operation...

Page 19: ...le up to a maximum of 35 A for internal current sensors and 70 A for external current sensors Only consumers that are installed downstream of the component on the grid connection side and in the same...

Page 20: ...grid parallel and standby power operation standard Fig 4 Installation of grid parallel and standby power operation Installation Grid parallel operation Fig 5 Installation of grid parallel operation L...

Page 21: ...y Fig 6 Installation with separate external supply Integration according to grid types The component is suitable for integration into various grid types The wiring from the component in the local inst...

Page 22: ...ntegration in TT grid 8 3 Connection to the power grid DANGER Serious injury or death from touching live parts Disconnect the electric circuits to be worked on from all power sources Switch off all in...

Page 23: ...n must be chosen correctly Typically it is installed after the utility company s counter and before the first load output Observed the integration options shown in 8 2 Component is securely mounted se...

Page 24: ...fully close the cable gland W_36 8 If you want to use external current sensors install them and connect the cables to the CS connections on the side L1 L2 L3 see Fig 10 9 Check that the phases or curr...

Page 25: ...ction off grid PE Earth potential Fig 9 Grid connection with cable gland and assignment 8 4 Communication to the inverter The communication cable requires RJ45 plugs on both sides and must comply with...

Page 26: ...vated when the blueplanet hybrid inverter is started This can also be used to make settings on the component e g the selection of the current sensors Please refer to the manual of the blueplanet hybri...

Page 27: ...currents can be measured see 8 2 The current sensors can be selected on the blueplanet hybrid inverter via the user interface or the hy sys software For more information please refer to the operating...

Page 28: ...lation engineer Repairs may only be carried out by authorised electricians The air inlets of the component may not be covered during operation 10 2 Cleaning Clean the exterior of the housing with a dr...

Page 29: ...approx 20 m Test another communication cable if available 2 Check the correct connection to the grid and the correct earthing of the component The blueplanet hybrid inverter supplies the component wi...

Page 30: ...ponent Comply with all safety regulations and current technical connection specifications of the responsible power supply company Shutdown sequence 1 Switch off the blueplanet hybrid inverter 2 Discon...

Page 31: ...old down the cover 4 Check that no voltage is present using suitable voltage tester 5 Apply a voltage of 9 12 V to the XS500 socket with a suitable power supply unit Polarity Outside minus inside plus...

Page 32: ...tain the component Comply with all safety regulations and current technical connection specifications of the responsible power supply company 1 Ensure that the component is disconnected from the power...

Page 33: ...c hinges 11 4 Packaging the component Component is dismantled see 11 3 1 If possible always pack the component in its original packaging If this is no longer available an alternative is to use equival...

Page 34: ...sure that the transport packaging is disposed of properly 13 Service and warranty If you need help solving a technical problem with one of our KACO products please contact our service hotline Please h...

Page 35: ...ACO blueplanet hybrid inverters Page 35 NOTE Observe our general warranty conditions for inverters and accessories The maximum length of the warranty is based on the currently applicable national warr...

Page 36: ...rsulm Germany Tel 49 7132 896 0 info kaco newenergy de www kaco newenergy com 3015682 02 220805 The text and figures reflect the current technical state at the time of printing Subject to technical ch...

Reviews: