Table 14: Site Preparation Checklist for Services Gateway
Installation
(continued)
Notes
Date
Performed By
Additional
Information
Item or Task
“SRX110
Services
Gateway Site
Electrical Wiring
Guidelines” on
page 37
“SRX110
Services
Gateway Power
Specifications
and
Requirements”
on page 39
•
Measure the distance
between the external
power sources and
the device installation
site.
•
Locate sites for
connection of system
grounding.
•
Calculate the power
consumption and
requirements.
Rack Requirements
“SRX110
Services
Gateway Rack
Requirements”
on page 33
Verify that your rack
meets the minimum
requirements.
Rack Installation
“Preparing the
SRX110 Services
Gateway for
Rack-Mount
Installation” on
page 55
•
Plan the rack location,
including the required
space clearances.
•
Secure the rack to the
floor and the building
structure.
Cabinet Requirements
“SRX110
Services
Gateway
Cabinet
Requirements”
on page 32
•
Verify that your
cabinet meets the
minimum
requirements.
•
Plan the cabinet
location, including the
required space
clearances.
Wall Installation
Copyright © 2015, Juniper Networks, Inc.
28
SRX110 Services Gateway Hardware Guide for H2 Model Numbers