Table 14: Site Preparation Checklist (continued)
Date
Performed By
For More Information
Item or Task
“Determining Interface Support for
the QFX3600 Device” on page 140
Determining Transceiver Support for
QFabric Systems
Acquire cables and connectors:
•
Determine the number of cables
needed based on your planned
configuration.
•
Review the maximum distance allowed
for each cable. Choose the length of
cable based on the distance between
the hardware components being
connected.
Plan the cable routing and management.
RELATED DOCUMENTATION
General Safety Guidelines and Warnings | 203
General Site Guidelines
Installing and Connecting a QFX3600 or QFX3600-I Device | 298
Site Preparation Checklist for a QFX3500 Device
The checklist in
summarizes the tasks you need to perform when preparing a site for
QFX3500 device installation.
Table 15: Site Preparation Checklist
Date
Performed By
For More Information
Item or Task
Environment
“Environmental Requirements and
Verify that environmental factors such as
temperature and humidity do not exceed
device tolerances.
Power
Measure distance between external power
sources and device installation site.
95
Summary of Contents for QFX3500
Page 1: ...Virtual Chassis Fabric Hardware Documentation Published 2020 11 06...
Page 225: ...Translation The emitted sound pressure is below 70 dB A per EN ISO 7779 201...
Page 229: ...205...
Page 238: ...Unterminated Fiber Optic Cable Warning 214...
Page 246: ...Restricted Access Warning 222...
Page 249: ...225...
Page 257: ...Jewelry Removal Warning 233...
Page 260: ...Operating Temperature Warning 236...
Page 271: ...DC Power Disconnection Warning 247...
Page 275: ...DC Power Wiring Sequence Warning 251...
Page 278: ...DC Power Wiring Terminations Warning 254...
Page 410: ...Figure 130 All QFX5110 VCF g050760 Figure 131 QFX5110 VCF with QFX5100 24Q Leaf Devices 386...
Page 412: ...Figure 132 QFX5100 24Q as a Leaf Device in a QFX5110 VCF 388...
Page 565: ...Table 105 System Information continued Description Field Inventory details 541...