Figure 214: Attaching the QFX10016 to the Pallet
17. Write the RMA number on the exterior of the box to ensure proper tracking.
Packing QFX10000 Switch Components for Shipping
Before you begin packing a switch component, ensure that you have the following parts and tools
available:
• Antistatic bag, one for each component
• Electrostatic discharge (ESD) grounding strap
CAUTION: Do not stack switch components. Return individual components in separate
boxes if they do not fit together on one level in the shipping box.
To pack and ship QFX10000 components:
1. Place individual FRUs in antistatic bags.
382
Summary of Contents for QFX10016
Page 1: ...QFX10016 Switch Hardware Guide Published 2022 09 09...
Page 10: ...Compliance Statements for Environmental Requirements 428 x...
Page 15: ...Figure 1 on page 5 shows a front and rear view of the QFX10016 4...
Page 16: ...Figure 1 QFX10016 Front and Rear 5...
Page 239: ...RELATED DOCUMENTATION QFX10008 Installation Overview QFX10002 System Overview 228...
Page 270: ...1 ESD point Figure 113 ESD Point on QFX10016 Chassis Rear 1 ESD point 259...
Page 287: ...Figure 130 Installing a JNP10K PWR AC2 in a QFX10016 276...
Page 322: ...Figure 159 Installing a JNP10K PWR DC2 in QFX10016 311...
Page 366: ...5 CHAPTER Troubleshooting Troubleshooting QFX10000 Modular Chassis 356...