Performing an Initial Configuration of a QFX10000 | 225
Installing the Front Panel on a QFX10000
The front panel is required on the QFX10008 and QFX10016 to protect fiber optic cabling and to
provide additional protection from electromagnetic interference (EMI). The front panel can be installed
with or without the optional cable management system.
Ensure you have the following tools and parts before you begin:
• A Phillips (+) screwdriver, number 2
• Front panel (provided with the switch chassis)
• Right base bracket (provided)
• Left base bracket (provided)
• 2 interchangeable latch brackets (provided)
• 8 Phillips flat-head mounting screws (provided)
To install the front panel:
1. Remove the plastic bag that is taped to the front panel, which holds the brackets and screws.
2. Use the Phillips screwdriver to attach two mounting screws to the left base bracket at the bottom left
side of the chassis frame. The base brackets are larger than the latch brackets.
211
Summary of Contents for QFX10016
Page 1: ...QFX10016 Switch Hardware Guide Published 2022 09 09...
Page 10: ...Compliance Statements for Environmental Requirements 428 x...
Page 15: ...Figure 1 on page 5 shows a front and rear view of the QFX10016 4...
Page 16: ...Figure 1 QFX10016 Front and Rear 5...
Page 239: ...RELATED DOCUMENTATION QFX10008 Installation Overview QFX10002 System Overview 228...
Page 270: ...1 ESD point Figure 113 ESD Point on QFX10016 Chassis Rear 1 ESD point 259...
Page 287: ...Figure 130 Installing a JNP10K PWR AC2 in a QFX10016 276...
Page 322: ...Figure 159 Installing a JNP10K PWR DC2 in QFX10016 311...
Page 366: ...5 CHAPTER Troubleshooting Troubleshooting QFX10000 Modular Chassis 356...