![Jungheinrich ETX 513 Operating Instructions Manual Download Page 141](http://html.mh-extra.com/html/jungheinrich/etx-513/etx-513_operating-instructions-manual_2032044141.webp)
4.2
Preparing the truck for operation
Switching on the truck
Requirements
– Visual inspections and operations to be
performed
before
starting
daily
– Connect the battery to the truck.
– Insert and lock the battery latch.
– Insert and lock the side panels correctly.
– Close the battery cover, see page 78.
– Enter the operator position, see
Procedure
• Turn the EMERGENCY DISCONNECT switch (9) to unlock it.
Z
Press the Emergency Disconnect (9) immediately if the truck starts to move or lift
as soon as it is switched on. Brief steering movements caused by steering
referencing are permissible.
• Switch on the truck, to do this:
• Insert the key in the key switch (8) and turn it as far right as it will go.
• Hold the card or transponder in front of the ISM access module (26) and
depending on the setting press the green button on the ISM access
module (26) (
o
).
8
9
26
Z
The truck is now operational.
The steering is in the straight-ahead position.
139
04.19 en-GB
Summary of Contents for ETX 513
Page 1: ...ETX 513 ETX 515 03 11 Operating instructions 51190312 04 19 en GB ETX 513 ETX 515...
Page 2: ...2...
Page 4: ...4 04 19 en GB...
Page 12: ...0506 GB 2 0506 GB 2...
Page 34: ...4 2 2 Dimensions of ETX 513 T F ETX 513 T F with telescopic table z 32 04 19 en GB...
Page 36: ...z 34 04 19 en GB...
Page 54: ...52 04 19 en GB...
Page 96: ...94 04 19 en GB...
Page 152: ...4 7 Emergency Disconnect 9 150 04 19 en GB...
Page 360: ...358 04 19 en GB...
Page 384: ...02 16 EN 6...
Page 386: ...02 16 EN 8 14 Safety instructions and warning information...
Page 408: ......