5.3
Servicing PzV and PzV-BS lead-acid batteries with sealed armour
plated cells
Z
Do not add water!
5.3.1
Daily
– Charge the battery after each discharge.
5.3.2
Weekly
– Visually inspect for dirt and physical damage.
5.3.3
Every three months
– Measure and record the overall voltage.
– Measure and record the individual voltages.
– Compare the results with the previous ones.
Z
Carry out the measurements after full charging and subsequent resting for at least 5
hours.
Z
If you find significant differences compared with the previous measurements or
differences between the cells, contact the manufacturer's customer service
department.
5.3.4
Annually
– Measure the insulation resistance of the truck in accordance with EN 1175-1.
– Measure the insulation resistance of the battery in accordance with DIN EN
1987-1.
Z
In accordance with DIN EN 50272-3 the battery insulation resistance should not be
less than 50 Ω per volt of rated voltage.
162
04.19 en-GB
Summary of Contents for ESE 220
Page 1: ...ESE 220 320 03 10 Operating instructions 51163703 04 19 en GB ESE 220 ESE 320...
Page 2: ...2...
Page 4: ...4 04 19 en GB...
Page 10: ...10 04 19 en GB...
Page 14: ...14 04 19 en GB...
Page 49: ...2 Displays and Controls 5 7 10 49 50 51 52 53 11 14 13 54 55 56 17 49 04 19 en GB...
Page 70: ...17 10 70 04 19 en GB...
Page 79: ...The brake is now released The truck can be moved 79 04 19 en GB...
Page 148: ...148 04 19 en GB...