4
Maintenance and repairs
4.1
Preparing the truck for maintenance and repairs
All necessary safety measures must be taken to avoid accidents when carrying out
maintenance and repairs. The following preparations must be made:
Procedure
• Park the truck securely, see page 71.
• Disconnect the battery to prevent the truck from being switched on accidentally.
WARNING!
Risk of accidents when working under the load handler and lift truck
u
When working under a raised load handler or a raised truck, secure them to
prevent the truck from from lowering, tipping or sliding away.
u
When raising the truck, follow the instructions, see page 35. When working on the
parking brake, prevent the truck from accidentally rolling away (e.g. with wedges).
4.2
Lifting and jacking up the truck safely
WARNING!
A truck tipover can cause accidents
In order to raise the truck, use only suitable lifting gear at the points specially
provided for this purpose.
u
Note the weight of the truck on the data plate.
u
Always use a jack with sufficient capacity.
u
Raise the unladen truck on a level surface.
u
When raising the truck, take appropriate measures to prevent it from slipping or
tipping over (e.g. wedges, wooden blocks).
154
04.19 en-GB
Summary of Contents for EJE 220
Page 2: ...2...
Page 4: ...4 04 19 en GB...
Page 22: ...4 2 Dimensions D 22 04 19 en GB...
Page 34: ...34 04 19 en GB...
Page 59: ...2 Displays and Controls 6 5 53 7 12 6 52 50 10 8 13 54 55 14 56 51 49 59 04 19 en GB...
Page 61: ...6 5 53 7 12 6 52 50 10 8 13 54 55 14 56 51 49 61 04 19 en GB...
Page 63: ...6 5 53 7 12 6 52 50 10 8 13 54 55 14 56 51 49 63 04 19 en GB...
Page 64: ...64 04 19 en GB...
Page 91: ...91 04 19 en GB...
Page 92: ...92 04 19 en GB...
Page 96: ...96 04 19 en GB...
Page 144: ...144 04 19 en GB...
Page 170: ...170 04 19 en GB...