4.9.6
Lowering two palletised loads in turn
Z
EJC 212z/214z/216z/220z only
Z
For double decker option only
CAUTION!
Loads must not be deposited on travel or escape routes, in front of safety
mechanisms or plant equipment that must be accessible at all times.
Requirements
– Storage location suitable for storing the load.
Procedure
• Drive the truck carefully up to the first storage location.
• Lower the support arms until the load is resting on the floor.
• Carefully move the support arms out of the pallet.
• Lower the load handler, see page 103.
• Drive the truck carefully up to the second storage location.
• Lowers the load handler.
Z
To avoid damaging the load and the load handler, avoid setting the load down
abruptly.
• Lower the load handler so that it is clear of the load (see page 99).
• Carefully drive the load handler out from beneath the pallet.
Both pallets are lowered.
107
04.19 en-GB
Summary of Contents for EJC 212z
Page 2: ...2 ...
Page 4: ...4 04 19 en GB ...
Page 10: ...10 04 19 en GB ...
Page 12: ...0506 GB 2 0506 GB 2 ...
Page 27: ...EJC 212z 214z 216z 220z D 25 04 19 en GB ...
Page 50: ...48 04 19 en GB ...
Page 74: ...72 04 19 en GB ...
Page 135: ...Z This setting can be changed if required 133 04 19 en GB ...
Page 193: ...Z After adding hydraulic oil tighten the lock to 10 Nm M 10Nm 191 04 19 en GB ...
Page 195: ...115 113 114 112 193 04 19 en GB ...
Page 226: ...02 16 EN 6 ...
Page 228: ...02 16 EN 8 14 Safety instructions and warning information ...
Page 250: ......