4.9.4
Lifting two palletised loads
Z
EJC 212z/214z/216z/220z only
Z
For double decker option only
CAUTION!
Risk to operational stability
In order not to jeopardize the operational stability, pay attention to the weight when
transporting two pallets so that the truck does not tip over.
u
In order not to jeopardize the operational stability, the heavier pallet should always
be transported underneath.
Requirements
– Load correctly palletised.
– Load weight matches the truck's rated capacity.
– Load handler evenly laden for heavy loads.
Procedure
• Drive the truck slowly up to the pallet.
• Insert the load handler slowly into the first pallet
until the pallet is resting against the back of the
load handler (see right-hand graphic).
Z
The load must not extend by more than 50 mm
beyond the load handler tips.
• Raise the load handler until you reach the
desired height, (see page 98).
Z
In double-decker mode the load handler must not be raised higher than 1800 mm.
The bottom load must be heavier than the upper load.
• Insert the support arms under the second pallet.
• Raise the support arms with the "Support arm lift" button.
Both pallets are raised.
105
04.19 en-GB
Summary of Contents for EJC 212z
Page 2: ...2 ...
Page 4: ...4 04 19 en GB ...
Page 10: ...10 04 19 en GB ...
Page 12: ...0506 GB 2 0506 GB 2 ...
Page 27: ...EJC 212z 214z 216z 220z D 25 04 19 en GB ...
Page 50: ...48 04 19 en GB ...
Page 74: ...72 04 19 en GB ...
Page 135: ...Z This setting can be changed if required 133 04 19 en GB ...
Page 193: ...Z After adding hydraulic oil tighten the lock to 10 Nm M 10Nm 191 04 19 en GB ...
Page 195: ...115 113 114 112 193 04 19 en GB ...
Page 226: ...02 16 EN 6 ...
Page 228: ...02 16 EN 8 14 Safety instructions and warning information ...
Page 250: ......