J630D
2. Technical data / transportation / commissioning 26.7.02
41
2.7
Storage
2.7.1
Temporary storage
The following points should be noted in the event that the machine needs to be
stored temporarily prior to installation:
•
Do not remove the machine from the packaging or crate.
•
See transportation dimensions for storage dimensions.
•
The permissible floor load must not be exceeded.
•
The storage location must also fulfil the following requirements:
– Dry
– Under cover
– Protected against moisture condensation
– Storage temperature b10°C and +30°C
– Vibration-free
2.7.2
Installation
Installation requirements
•
Note the permissible floor load.
•
Connection and installation requirements. See section 2.1 “Technical data” on
page 25.
•
Make sure sufficient floor space is available. See section 2.3 “Floor space dra-
wing” on page 29.
•
Ensure adequate lighting.
•
The machine must always be installed on a stable, level base. This base must
be free from extraneous vibrations and abrupt shocks of any kind.
•
Keep the machine away from draughts as well as from hot air streams dischar-
ged by other machines.
•
Do not expose the machine to direct sunlight.
If the machine is to be installed by Jung personnel, please store it in
accordance with the conditions described below.
Please heed the points listed below. They are essential in order to
ensure good grinding results and a long machine service life.
Summary of Contents for J630D
Page 6: ......
Page 7: ...Operating Instructions J630D...
Page 8: ......
Page 12: ......
Page 14: ......
Page 18: ......
Page 20: ......
Page 30: ......
Page 34: ......
Page 35: ...J630D 2 Technical data transportation commissioning 26 7 02 29 2 3 Floor space drawing...
Page 36: ......
Page 38: ......
Page 46: ......
Page 48: ......
Page 56: ......
Page 60: ......
Page 62: ......
Page 64: ......
Page 66: ......
Page 80: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 100: ......
Page 106: ......
Page 114: ......
Page 130: ......
Page 134: ......
Page 136: ......
Page 142: ......
Page 144: ......
Page 148: ......
Page 154: ......
Page 158: ......
Page 160: ......
Page 172: ......
Page 188: ......
Page 190: ......
Page 198: ......
Page 200: ......
Page 208: ......
Page 210: ......
Page 218: ......
Page 222: ......
Page 226: ......
Page 236: ......
Page 244: ......
Page 246: ......
Page 248: ......
Page 258: ......
Page 262: ......
Page 276: ......
Page 278: ......
Page 286: ...J630D 280 26 7 02 9 Maintenance servicing disposal 9 3 5 Lubrication instruction plate...
Page 290: ......
Page 291: ...J630D 9 Maintenance servicing disposal 26 7 02 285 9 4 Hydraulic plan...
Page 295: ...J630D 9 Maintenance servicing disposal 26 7 02 289 9 5 Pneumatic plan...
Page 296: ......
Page 300: ......
Page 302: ......
Page 304: ......
Page 310: ......
Page 312: ......
Page 314: ......
Page 316: ......